
This is how the car looks right now...

There are many things that need to be done before the 1600 will be back on the road. I am making a list of stuff that needs to be done in stage one
Stage one: Get Car running and street legal
This will include flushing the fuel system. Installing a radiator, new battery checking all the fuses that are missing. install a shift lever the one out of the 2002 may fit. I need to find 4 good tires and rims out of the lot that i got with the cars. Change the oil and filters man there is a ton of stuff to get this car going.
Vincent jun 9th 2006